
Capacity on your schedule
- Powered landUp to 3 GW
- First power250 MW in 12 months
- First gigawattWithin 24 months
- GPU clustersIn 10–12 weeks
Megawatts by the month
Halls energize in phases on land where the power is already secured. A new grid connection is still at zero.
Month 3Site and design
sites
0 MW
GPU clusters in our facilities · Running
A new grid connection
0 MW
Studies, queue and build
Milestones from edgevana.com: 250 MW within 12 months, 1 GW within 24. The climb between them is an illustration.
Where the power is, and when
Every site with its power status and first-power date. Named sites, studies and plans are shared under NDA.
- All sites
- 3,000 MW
- Substation in construction
- 250 MW
- Power secured
- 750 MW
- Permitting
- 2,000 MW
Enter at any layer
Bring as much as you have. We deliver the rest, on land where the power is already secured. Pick a way in to see what it covers.
Land with the power secured. You design, build and run the campus.
DesignYour team
BuildYour team
RunYour team
First capacity250 MW within 12 months
Rack densityYour design
Powered landWhat we deliver - Your workloads
- Operations
- Racks and GPUs
- Halls: power and cooling
- Building shell
- Land and power
We can finance the build
Deals structured across the land, the halls and the GPUs, so capital doesn’t set your schedule.
Capacity reservation
Hold megawatts on a site and its first-power date ahead of the build.
Hardware leasing
GPUs and racks on a lease, paid for as they run instead of up front.
Joint ventures
Co-own a campus with us, phase by phase.

Request a site shortlist





