Capacity on your schedule

  • Powered landUp to 3 GW
  • First power250 MW in 12 months
  • First gigawattWithin 24 months
  • GPU clustersIn 10–12 weeks
01The ramp

Megawatts by the month

Halls energize in phases on land where the power is already secured. A new grid connection is still at zero.

Month 3Site and design

sites

0 MW

GPU clusters in our facilities · Running

A new grid connection

0 MW

Studies, queue and build

Milestones from edgevana.com: 250 MW within 12 months, 1 GW within 24. The climb between them is an illustration.

02Sites

Where the power is, and when

Every site with its power status and first-power date. Named sites, studies and plans are shared under NDA.

All sites
3,000 MW
Substation in construction
250 MW
Power secured
750 MW
Permitting
2,000 MW
03Ways to buy

Enter at any layer

Bring as much as you have. We deliver the rest, on land where the power is already secured. Pick a way in to see what it covers.

04Financing

We can finance the build

Deals structured across the land, the halls and the GPUs, so capital doesn’t set your schedule.

  • Capacity reservation

    Hold megawatts on a site and its first-power date ahead of the build.

  • Hardware leasing

    GPUs and racks on a lease, paid for as they run instead of up front.

  • Joint ventures

    Co-own a campus with us, phase by phase.

Ask about financing
An exploded aluminium model of a campus: a land slab with a fenced substation at the bottom, two data hall buildings floating above it, and a plate of GPU racks floating on top, thin lines tying the layers together.

Request a site shortlist

Tell us your load and your date