AI campuses, designed and delivered to your spec

  • Powered landUp to 3 GW
  • Powered shell6–9 months
  • Full campus12–18 months
  • One contractLand to GPUs
01The build

Compute deploying in weeks, not years

A typical build waits years for land, power and permits. Ours start on land with the power secured: compute deploys from week 8, the site is ready for service from week 12, the powered shell follows in 6–9 months and the full campus in 12–18.

  1. Build-to-suit

    We build · long-term lease · 50 MW to 1 GW+

    Design and permits

    Design and permitsCompute
  2. Typical deployment

    You find land · queue with the utility · size set by the utility

    Find land

    Find landLoad studyAgreementSubstation and lines
02Ways to work

Take as much of the build as you want

Every model starts on land with the power secured. You choose where we hand over. Timings depend on the site, its location and its power.

Pick a model

Handover

  1. Land
  2. Power
  3. Shell
  4. PlantYour team
  5. Fit-outYour team
  6. OperationsYour team

Land, power and the building shell. Your team fits out the halls.

First power6–9 months

03Design basis

A standard to start from, your spec to finish

Typical values. Every campus is designed with your engineers. Pick a part of the campus to see its standard.

An aluminium model of an AI campus: a fenced substation, a yard of backup generators, three data halls with dry coolers on their roofs and a fourth with its roof off, showing rows of liquid-cooled racks.
04Campuses

Built on our powered land

Every campus starts on a site with the power secured. Phases and dates are shared under NDA. Pick a region, then a site.

All sites
3,000 MW
Substation in construction
250 MW
Power secured
750 MW
Permitting
2,000 MW

Start a campus

Tell us what you need to build

We are *
Region *
Delivery model

We use these details only to answer you. See our Privacy Policy.