
From your first cluster to your own campus
- First cluster10–12 weeks
- GPUs150K+
- Powered landUp to 3 GW
- First gigawattWithin 24 months
One cluster now. A gigawatt in two years
Start on dedicated racks in our halls, and grow into a campus of your own on our powered land, without changing partners.
How big is your next run?
Pick a system and a GPU count. See the racks, the power and where it runs.
Start from a run
10,000GPUs
- Racks
- 139
- Power, IT load
- 19MW
Each square, 2 racks
Where it runs
- Dedicated AI clusters10–12 weeksSee the systems
- A campus of your ownFirst 250 MW within 12 months
- A gigawatt campusWithin 24 months
Estimates. GB300 NVL72 at 72 GPUs and about 135 kW a rack; B300, B200 and H200 at four 8-GPU servers a rack, about 60, 58 and 41 kW. The example runs are sizes for scale, not quotes. Your site’s design sets the real figures.

Built for runs that finish
Bare metal, our own optics and liquid cooling, watched live, so a long run gets to its last step.
Serve it, finance it, keep it yours
- Under 90 msEdgeAI
Serve your model where your users are
EdgeAI answers from towers and edge nodes near the user, not from a region away.
- 4 waysFinancing
Pay for it your way
From capacity by the hour to a campus of your own, with deals structured across the land, the halls, the GPUs and the network.
- 1 tenantAsk for the security pack
Keep it yours
Your racks run only your work: single-tenant bare metal, and our security pack under NDA.
Request a capacity plan








